News

17
Apr

EII – Rear walkway trusses go in

Austral are progressing on site at a great pace.  Following receival of the last of the steelwork installation of the rear walkway trusses have begun.  65t lift via the Manitowok 1600 on the Westsea barge.  Roam designed trunnions to be installed in the shop on the trusses for ease of installation.

363 catwalk 3 to 7


Comments are closed.