After assisting with tender with Austral Construction, Roam Marine have designed and detailed all the temporary works for the above project during 2013.  Thus far all works have been a success and testimonials are as below:

“Thanks for the help on the tender with Construction methods, Temporary works and alternative designs – couldn’t have done it without you” – Troy Richardson, Marine manager of Austral Construction.

“Professional, construction minded, with a complete grasp of marine work, methodologies and the integration of safety not only in the design but the construction execution” – Aaron Turner, Director of Austral Construction

Pictures to date are up in the Temporary works page.